Home / Engagement / Recognition and milestones
Research in policy and practice · No. 50 · 2020
Professor Amir’s BIM research in a Bosch facilities-digitalisation case
Bosch Campinas · Júlio Franco · ABRAFAC facilities-management case report
- Role
- Industrial BIM project rationale
- Host
- Bosch Campinas · Júlio Franco · ABRAFAC facilities-management case report
- Publication
- BIM, facilities and COVID-19: digitalisation at Bosch to address the crisis
- Contribution
- Industrial BIM project rationale
- Evidence
- 23 June 2020 · Introduction, printed page 1 · Full reference page 9
Research reaching practice
A Bosch Campinas facilities-digitalisation report uses Professor Amir’s BIM-uptake review alongside its account of completed industrial BIM pilots.
How the research was used
The introduction cites Professor Amir’s paper to explain how richer, structured information can support collaboration between project teams. The case then documents drone inspection and photogrammetry, scan-to-BIM and a shared digital collaboration environment. The research connection is the information-and-collaboration rationale within this industrial implementation account.
The documented contribution
23 June 2020 · Introduction, printed page 1 · Full reference page 9. The case’s implementation methodology follows other industry guides. Professor Amir is not credited with designing the pilots, developing Bosch systems or causing their measured outcomes.
Research and coauthor credit
Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges — Ali Ghaffarianhoseini; John Tookey; Amirhosein Ghaffarianhoseini; Nicola Naismith; Salman Azhar; Olia Efimova; Kaamran Raahemifar. DOI: 10.1016/j.rser.2016.11.083